360 Home Enhancers
Bathroom Renovation Proposal

House Sadiki

A modern, warm and functional bathroom — light tan tiles, black finishes, a freestanding bath and a long oval mirror, brought together with quiet, intentional craft.

Reference
QO10013
Duration
6–7 Days
Location
Rivonia
Bathroom render
01 · Client Details

A bespoke proposal, tailored for you.

Everything in this document is scoped specifically for the bathroom at House Sadiki in Rivonia.

Client
Dovhani Sadiki
Address
1A 11th Avenue, The Willows, Rivonia
Reference
QO10013
Prepared by
360° Home Enhancers
Duration
6 – 7 Working Days
02 · Project Overview

A clean, warm and elegant modern bathroom.

360° Home Enhancers proposes a full bathroom renovation centred on a refined material palette — light tan tiles paired with sharp black finishes for a modern, intentional contrast. The space gains a long oval mirror and a tall storage cabinet for presence, light and quiet utility.

Warm
Light tan tonal palette across walls and floor
Modern
Sharp matte black tapware and accessories
Spacious
Reflective oval mirror, considered lighting
Functional
Smart, built-in long storage cabinet
03 · Material Inspiration

The mood, set in stone.

Two key references anchor the design — a light tan stone-look tile for warmth across walls and floor, and a long 600 × 1800mm oval mirror with a slim black frame as the room's signature piece.

Matte black tapware, accessories and a bath screen carry the contrast through every touchpoint — quiet, deliberate, and crisp against the warm tan field.
Light tan tile
Light Tan Stone TileWalls + Floor
Oval mirror
Oval Black-Frame Mirror600 × 1800 mm
Visualisations

The bathroom, rendered.

A walk-through of the proposed scheme — material, light and proportion in dialogue.

Render 1
Render 2
Render 3
04 · Proposed Finishes

Every detail, specified.

A complete schedule of finishes included in the quotation — selected to balance warmth, function and a sharp modern edge.

  • 01Light tan bathroom tiles
  • 02Black basin wall tap
  • 03Black multifunction shower
  • 04Black bath screen
  • 05Black bathroom accessories
  • 06Freestanding bathtub
  • 07Floating toilet set
  • 08Single basin vanity
  • 09Freestanding basin
  • 10Long bathroom storage cabinet
  • 11Long 600 × 1800mm oval mirror
  • 12Ceiling light
  • 13Bathroom painting & finishing
  • 14Cornice installation & finishing
05 · Scope of Work

From rubble to refined finish.

Four phases delivered end-to-end by our project team — every step accounted for in the quotation.

01
Removal & Preparation
  • Removal of existing bathroom items
  • Site preparation before plumbing & tiling
  • Rubble handling and skip bin allowance
  • Surface preparation for new tile installation
02
Plumbing Works
  • Plumbing prep for basin, bath, shower & toilet
  • Install prep for black tap & multifunction shower
  • Plumbing connection for freestanding bathtub
  • Plumbing for the floating toilet set
  • Plumbing material allowance included
03
Tiling Works
  • Installation of light tan tiles
  • Tile cement & surface preparation
  • Wall and floor tiling per approved layout
  • Cutting, alignment, spacing & grout prep
  • Final grout and tile cleaning
04
Installation & Finishing
  • Freestanding bath, floating toilet & vanity
  • Long storage cabinet, oval mirror & accessories
  • Black tapware, bath screen & ceiling light
  • Cornice installation & paint touch-ups
  • Final cleaning and snagging
06 · Project Timeline

Six to seven working days.

A structured workflow keeps every phase tidy, predictable and on schedule.

  1. Phase 01
    Day 1 – 2
    Plumbing Works

    Plumbing preparation and adjustments. Water and drainage points prepared for basin, bath, shower and floating toilet.

  2. Phase 02
    Day 3 – 4
    Tiling Works

    Light tan tiles installed per the approved layout. Tile alignment, cutting, spacing and grout for a neat, professional finish.

  3. Phase 03
    Day 5
    Finishing Works

    Black taps, accessories, vanity, freestanding basin, long mirror, storage cabinet, toilet set, bath screen and ceiling light installed.

  4. Phase 04
    Day 6 – 7
    Buffer Period

    Buffer for curing time, plumbing adjustments, material delays or minor snag corrections — keeping finish quality high.

Next Step

Let's transform House Sadiki.

Approve the proposal and we'll schedule a site walk-through, finalise tile sampling and lock the start date.

Call
010 065 5177
Email
info@360home.co.za
Site
1A 11th Avenue, Rivonia